Remove 2019 Remove Aerospace Remove Budget Remove SCRUM
article thumbnail

Risk Management Resources

Herding Cats

“Project Risk Identification Based on the Interaction of Risks from the Approach of Multi-Agent Simulation,” Peng Huang, Peng Di, and Jinrui Li, 4 th International Conference of Energy Equipment Science and Engineering , 2019. 85 1 Feb 2019. “An Sensitivity analysis methods for uncertainty budgeting in system design,” Max M.

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

“Project Risk Identification Based on the Interaction of Risks from the Approach of Multi-Agent Simulation,” Peng Huang, Peng Di, and Jinrui Li, 4 th International Conference of Energy Equipment Science and Engineering , 2019. 85 1 Feb 2019. “An Sensitivity analysis methods for uncertainty budgeting in system design,” Max M.

article thumbnail

Software Estimating Resources

Herding Cats

Bool, CrossLink: The Aerospace Corporation, Winter, 2000/2001, pp. Jones and Stephen Cullum, arXiv preprint arXiv:1901.01621 (2019). Springer, Singapore, 2019. Categorical Variable Segmentation Model for Software Development Effort Estimation,” Petr Silhavy, Radek Silhavy, And Zdenka Prokopova, IEEE Access, 29 January 2019.