Deconstructing The Cone of Uncertainty

Herding Cats

The paper on the Cone of Uncertainty is used by many in the No Estimates community as an example of why estimates are of little use. In this paper, there is data that does not follow the Cone of Uncertainty, in that the uncertainty of the estimates does not reduce as the project proceeds. Then there is some analysis.

2007 42
article thumbnail

Cone of Uncertainty - Revisited

Herding Cats

“Coping with the Cone of Uncertainty: An Empirical Study of the SAIV Process Model,” Da Yang, Barry Boehm, Ye Yang, Qing Wang, and Mingshu Li, ICSP 2007 , LNCS 4470, pp. 37–48, 2007. Shrinking the Cone of Uncertainty with Continuous Assessment for Software Team Dynamics in Design and Development,” Pongtip Aroonvatanaporn,”Ph.D.

2012 29
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Misinterpretations of the Cone of Uncertainty

Herding Cats

The Cone of Uncertainty is a framing assumption used to model the needed reduction in some parameter of interest in domains ranging from software development to hurricane forecasting. The Cone of Uncertainty as a Technical Performance Measure. The Cone of Uncertainty as a Technical Performance Measure.

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). Estimates are needed but are subject to large level of uncertainty. There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).

article thumbnail

Managing in Presence of Uncertainty

Herding Cats

This is an immutable principle that impacts planning, execution, performance measures, decision making, risk, budgeting, and overall business and technical management of the project and the business funding the project no matter the domain, context, technology or any methods. All project work operates in the presence of uncertainty.

2010 28