Remove 2009 Remove Budget Remove Estimate Remove Performance Measurement
article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). Estimates are needed but are subject to large level of uncertainty. There can be cost and schedule performance measures as well.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).

article thumbnail

Modeling the Future is the Basis of Project Success

Herding Cats

For approaches that have been implemented on existing systems, obtaining such understanding may require measurement and analysis. For scenarios where the project under consideration does not yet exist, performance prediction using analytical modeling or simulation is necessary. This is the basis of Earned Value Management.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Deliverables Based Planning: Providing Actional Information to the Program Manager - 11th Annual Rocky Mountain Project Management Symposium , 2009. Risk Management (#RM).

article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

All making things smaller dos is show that you're late, over budget, and what you're building (Technical Performance Measures) doesn't work faster. But when some statement is made about risk, estimating, performance modeling, or the like - always ask for references. This is good, but it doesn't reduce risk.

article thumbnail

Fighting Uncertainty in Organizations, Including Matrix Ones

Epicflow Blog

” Eli Schragenheim The lesson is: when you ask for a clear one-number estimation, without defining the level of common and expected uncertainty, then you either might face big surprises or face frequent occurrences, where the project/mission finished exactly on time.

2016 52