Risk Management Resources

Herding Cats

Risk Management is essential for development and production programs. Information about key project cost, (technical) performance, and schedule attributes is often uncertain or unknown until late in the program. Effective Risk Management 2 nd Edition , Edmund Conrow, AIAA, 2003. Risk Management Papers. “A De Meyer, C. “A

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

This blog page is dedicated to the resources used to manage the risk encountered on software-intensive systems using traditional and agile development methods. Let's start with a critical understanding of the purpose of managing risk on software development projects. IEEE Transactions on Software Engineering , Vol.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Misunderstanding Making Decisions in the Presence of Uncertainty

Herding Cats

The naturally occurring work effort in the development of a software feature - even if we've built the feature before - is an irreducible uncertainty. The risk is created when we have not accounted for this natural variances in our management plan for the project. An aleatory risk is expressed as a relation to a value.

2003 46
article thumbnail

Without a Root Cause Analysis, No Corrective or Preventive Action is Credible - Part 1

Herding Cats

“A Taxonomy of an IT Project Failure: Root Causes,” Walid Al-Ahmad, Et Al, International Management Review, Vol. Why Do Information Technology Projects Fail?” Automated Root Cause Isolation of Performance Regressions during Software Development,” Christopher Heger, Jens Happer, and Roozbeh Farahbod, ICPE ’13, April 21?24,

2014 45
article thumbnail

Cone of Uncertainty Bibliography

Herding Cats

It can be the needed performance of a measure - Effectiveness, Performance, Key Performance Parameter, or a Technical Performance Measures. The specifics of the Technical Performance Measures applied to inform Physical Percent Complete and the Cone of Uncertainty around the TPM are shown here. Here's a summary of these elements.

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

If we look at the discipline of software engineering, we see that the microeconomics branch of economics deals more with the types of decisions we need to make as software engineers or managers. Software engineering economics." IEEE Transactions of Software Engineering, 1 (1984): 4-21.

article thumbnail

Software Estimating Resources

Herding Cats

Monte Carlo Schedule Risk Analysis,” Intaver Institute, Inc. Effort Estimation of Use Cases for Incremental Large-Scale Software Development,” Pareastoo Mohagheghi, Bente Anda, and Reidat Conradi, Proceedings of the 27th international conference on Software engineering. 61, September 2004. Chakraborty and K.