A Resource Leveled and Smoothed Schedule
MPUG
JULY 1, 2019
A schedule, resource leveled (left Gantt chart) and smoothed (right Gantt chart). In the figure above, a schedule was resource leveled using Project (left Gantt chart). It was resource smoothed using Excel (right Gantt chart). Leveling the Schedule in Project.