Remove 2003 Remove Article Remove Performance Measurement Remove Software Engineering
article thumbnail

Start with Principles, Not Personal Anecdotes

Herding Cats

In the project domain, an estimate is a calculated approximation of some desired measurement. This is usually a cost, a completion date, a performance measure used in a closed loop control system to keep the project GREEN while delivering the needed Capabilities to produce the Value for the customer at the needed time for the needed cost.