Remove 2011 Remove Construction Remove Estimate Remove Performance Measurement
article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

All making things smaller dos is show that you're late, over budget, and what you're building (Technical Performance Measures) doesn't work faster. But when some statement is made about risk, estimating, performance modeling, or the like - always ask for references. 3421, Second Edition, December 2011.

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

When we hear about software development disasters and then hear that estimates are to blame, and NOT Estimating will somehow reduce or prevent these disasters, think again. Each of the categories operates in the presence of uncertainty and requires that estimates be made about the probability, conseqeunce of the resutling risk.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Modeling the Future is the Basis of Project Success

Herding Cats

For approaches that have been implemented on existing systems, obtaining such understanding may require measurement and analysis. For scenarios where the project under consideration does not yet exist, performance prediction using analytical modeling or simulation is necessary. In the construction business, this is well understood.

article thumbnail

Complete Collection of Project Management Statistics 2015

Wrike

Construction/. earned an average of 16% more (approximately $14,500 ) than their non-credentialed peers in 2011. [6]. Estimated Project-Oriented Job Openings 2010-2020: . Construction – 34%. Implement/enhance performance measurement process – 39%. [13]. Inadequate cost estimates – 29%. 147,600. .

2015 60