article thumbnail

Benefits Of The Strategy Canvas Tool For Strategic PM’s

The Strategic Project Manager

Sustainability Efforts: Apple emphasizes sustainability and environmental responsibility, incorporating recycled materials and renewable energy into its product manufacturing processes. Performance Measurement: The Strategy Canvas can serve as a tool for monitoring and measuring the performance of projects, programs, and portfolios over time.

article thumbnail

PROJECT MANAGEMENT BENCHMARKING, an excellence enabling instrument

International Institute for Learning

The results must be carefully analyzed to account for cultural differences, political factors, and possibly the influence of local religions. Because of the strong behavioral influence, it is almost impossible to transpose a project management culture from one company to another. Step 3: Analyses of Results.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Managing Government Grant Projects at Arizona Public Service - APS management process for Department of Energy grant for algae CO2 capture project. Risk Management (#RM).

article thumbnail

Fallacy of the Day

Herding Cats

Measures of Performance - are performance measures that characterize physical or functional attributes relating to the system operation, measured or estimated under specific conditions. Measures of Performance. The Technical Performance Measures. Open Loop Control System.

2005 37
article thumbnail

Why Johnny Can't Do The Math

Herding Cats

For any system to be ergodic it has to be closed, with no outside influences. The same behavior works in a model of the gases in thermodynamics - Boyle's Law for example which says energy is distributed among accessible configurations in a random process. Hence the Boltzmann Distribution. . Leipzig: J. 89 in the 1923 reprint.)

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

But it needs to be tempered with a concern for early identification and resolution of a project's high-risk elements, so that people can get these resolved early and then focus their enthusiasm and energy on the positive aspects of their software product. risks that affect the cost and schedule measures of the program. Programmatic ?