Remove Certification Remove Closing Remove Seminar Remove Sustainability
article thumbnail

Navigating the AEC Industry: Key Trends and Challenges

Wrike

Architects: Design buildings and structures, taking into consideration factors such as aesthetics, functionality, and sustainability. The Different Stages Conceptualization: Architects and engineers collaborate closely with the clients to understand their requirements and objectives.

article thumbnail

My Journey as a Scrum Master

Scrum.org

Always eager to learn more, I registered for a certification program by which I could learn BiSL , ASL , ITIL , and PRINCE2. Wasn’t there a different way of developing, delivering, and sustaining complex products?”. I had never done a presentation at a seminar before, not even in Dutch and in The Netherlands! Too perfect.

SCRUM 118
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Episode 189 – Harmonizing Potential – The Jazz of High-Performing Project Teams

Velociteach

And then I realized they had all these certifications out there, the Novell certifications, the Microsoft certifications, the MCSE certifications, and all these different things like that. We have got to hit a rhythm that’s sustainable, that includes breaks, chances to refresh, to your point for today’s schedule.

article thumbnail

Webinar Recap: SIPOC Workshop Facilitation – Part 1: Overview of SIPOC and Systems

MPUG

Kyle: Within your history, you can print it, download your transcript and certificates of completion, including the one for today’s event. Jeff Bongiovani: I could start to pinpoint if I start looking closer and examining more closely at the situation, how that could be improved. You can do that by logging into mpug.com.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Open Loop / Closed Loop Project Controls - project management is a closed loop control system. A steering target is established, actions are taken, variances are assessed, corrective actions are taken to close the loop. RFETS was a nuclear bomb manufacturing plant, built in 1951, operating until 1989, and closed in 2005.