Remove 2011 Remove Executing Remove Performance Measurement Remove Software Development
article thumbnail

A Compendium of Works to Increase the Probability of Project Success

Herding Cats

Flawless Execution. Software for Your Mind: Patterns and Anti-Patterns for Creating and Maintaining a Shared Vision. Project Performance Management. Connecting the 5 Principles and 5 Practices of Performance-Based Project Management ® To Increase the Probability of Project Success. Technical Performance Measures.

2003 54
article thumbnail

Modeling the Future is the Basis of Project Success

Herding Cats

For approaches that have been implemented on existing systems, obtaining such understanding may require measurement and analysis. For scenarios where the project under consideration does not yet exist, performance prediction using analytical modeling or simulation is necessary. The IMS is then placed on a baseline in the PMB.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

Take for example the deployment of an ERP system, the installation, and startup of a process control system, the release of a suite of embedded software controllers for a car, aircraft, petrochemical plant. A recent survey of 600 firms indicated that 35% of them had at least one "runaway' software project. Now To Risk Management.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Product Development (#ProdDev). Agile Software Development (#ASD). Those lessons are directly transferable to the management of software development teams.

article thumbnail

Complete Collection of Project Management Statistics 2015

Wrike

How Project Success is Measured: 20% — Satisfied stakeholders. 41% say executive support. earned an average of 16% more (approximately $14,500 ) than their non-credentialed peers in 2011. [6]. 10% say Executive managers are certified. Implement/enhance performance measurement process – 39%. [13].

2015 60