Webinar Recap: Project Performance Measurement – Part 1: Overview Of Project Performance Measurements

MPUG

Please find below a transcription of the audio portion of Fletcher Hearn’s session, Project Performance Measurement – Part 1: Overview Of Project Performance Measurements, being provided by MPUG for the convenience of our members. Kyle: Hello, and welcome to part one of MPUGs Project Performance Measurement course.

article thumbnail

Webinar Recap: Project Performance Measurement – Part 2: What to Measure and How to Report

MPUG

Please find below a transcription of the audio portion of Fletcher Hearn’s session, Project Performance Measurement – Part 2: What to Measure and How to Report, being provided by MPUG for the convenience of our members. Kyle: And welcome to Part 2 of MPUG’s Project Performance Measurement course. Is it Eric?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Misinterpretations of the Cone of Uncertainty

Herding Cats

The Cone of Uncertainty is a framing assumption used to model the needed reduction in some parameter of interest in domains ranging from software development to hurricane forecasting. The Cone of Uncertainty as a Technical Performance Measure. Closed Loop Stochastic Adaptive control in the presence of Evolving Uncertainty.

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. This is the basis of Closed Loop Project Control Estimates of the needed reduction of uncertanty, estimates of the possisble reduction of uncertainty, and estimates of the effectiveness of these reduction efforts are the basis of the Close Loop Project Control System.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Start with Principles, Not Personal Anecdotes

Herding Cats

In the project domain, an estimate is a calculated approximation of some desired measurement. This is usually a cost, a completion date, a performance measure used in a closed loop control system to keep the project GREEN while delivering the needed Capabilities to produce the Value for the customer at the needed time for the needed cost.