Compendium of Works to Increase Probability of Project Success

Herding Cats

These materials have been presented at conferences, published in a journal or newsletter, a book or a chapter in a book, or applied during a client engagement across a wide range of firms and domains. Project Performance Management (#PPM). Technical Performance Measures (#TPM). Management Processes (#MP).

article thumbnail

Misinterpretations of the Cone of Uncertainty

Herding Cats

The Cone of Uncertainty as a Technical Performance Measure. Management of this reduction work and measurement of the progress is a Close Loop Control System paradigm. Closed Loop Control, has a goal, an action, a measurement, and a corrective action. The Cone of Uncertainty as a Technical Performance Measure.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

When actual measures of cost, schedule, and technical performance are outside the planned cone of uncertainty, corrective actions must be taken to move those uncertanties inside the cone of uncertanty, if the project is going to meet it's cost, schedule, and technical performance goals. . Resources. [1]

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

The Measures that are modeled in the Cone of Uncertainty are the Quantitative basis of a control process that establishes the goal for the performance measures. This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM). Resources. [1]

article thumbnail

Modeling the Future is the Basis of Project Success

Herding Cats

For approaches that have been implemented on existing systems, obtaining such understanding may require measurement and analysis. For scenarios where the project under consideration does not yet exist, performance prediction using analytical modeling or simulation is necessary. The IMS is then placed on a baseline in the PMB.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

When actual measures of cost, schedule, and technical performance are outside the planned cone of uncertainty, corrective actions must be taken to move those uncertanties inside the cone of uncertanty, if the project is going to meet it's cost, schedule, and technical performance goals. . Agile 2008 Conference. [18]

article thumbnail

Why Johnny Can't Do The Math

Herding Cats

Even if the state space were well-defined and finite, testing for ergodicity is problematic, since the phrase "let time tend to infinity" in the definition of ergodicity cannot be tested. Daniels, Conference on Complex Adaptive Systems, Procedia Computer Science , 20, pp. ISBN 0-07-048477-5. [3] Whitney and Charles B. 325-330, 2013.