Remove 2001 Remove Performance Measurement Remove Risk Management Remove Software
article thumbnail

Software Intensive System of Systems

Herding Cats

The domain I work in is categorized as Software Intensive System of Systems (SISoS). In this domain, we applied traditional program and project management methods for cost and schedule management at the top level. Cost, Schedule, and these measures are tightly interconnected. System of Systems” are not monolithic.

2001 31
article thumbnail

Software Intensive System of Systems

Herding Cats

The domain I work in is categorized as Software Intensive System of Systems (SISoS). In this domain, we applied traditional program and project management methods for cost and schedule management at the top level. Cost, Schedule, and these measures are tightly interconnected. System of Systems” are not monolithic.

2001 28
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Here's a collection of presentations, briefings, papers, essays, book content used to increase the Probability of Project Success (PoPS) I've written and applied over my career in the software-intensive system of systems and other domains. Business, Technical, Systems, Risk, and Project Management Briefings and Presentations.

article thumbnail

Fallacy of the Day

Herding Cats

Project Controls are Management Actions, either preplanned to achieve the desired result, or taken as a corrective measure prompted by the monitoring process. Project controls are concerned with the metrics of the project – quantities, time, cost, and other resources and their measurable beneficial outcomes for the project.

2005 37