Risk Management Resources

Herding Cats

Taxonomy-Based Risk Identification,” Marvin Carr, Suresh Konda, Ira Monarch, Carlo Ulrich, and Clay Walker, Technical Report, CMU/SEI-93-TR-6, Software Engineering Institute, June 1993. IEEE Transactions on Software Engineering , Vol. 5887, 2009. Software Engineering Institute, January 1996.

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

This blog page is dedicated to the resources used to manage the risk encountered on software-intensive systems using traditional and agile development methods. Let's start with a critical understanding of the purpose of managing risk on software development projects. IEEE Transactions on Software Engineering , Vol.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Misunderstanding Making Decisions in the Presence of Uncertainty

Herding Cats

Accuracy - how close is the estimate to the actual value? So in the end, if we are to make a decision in the presence of uncertainty, we MUST make estimates to develop a reliable shipping date while producing an accurate and precise estimate of the cost, schedule, and technical performance of the product shipped on that date.

2003 46
article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The planned value, the upper and lower control limits, the measures of actual values form a Close Loop Control System - a measurement based feedback process to improve the effectiveness and efficiency of the project management processes by [1]. Prentice-Hall, 1981.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The planned value, the upper and lower control limits, the measures of actual values form a Close Loop Control System - a measurement based feedback process to improve the effectiveness and efficiency of the project management processes by [1]. Prentice-Hall, 1981.

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. This is the basis of Closed Loop Project Control Estimates of the needed reduction of uncertanty, estimates of the possisble reduction of uncertainty, and estimates of the effectiveness of these reduction efforts are the basis of the Close Loop Project Control System.

article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

It just closed the loop faster. So here are some books, handbooks, and guides that sit on my shelf that are used pretty much all the time on the Software Intensive System of Systems we work on. Probabilistic Risk Analysis: Foundations and Methods , Tim Bedford and Roger Cooke, Cambridge University Press, 2009.