Remove 2012 Remove 2014 Remove Estimate Remove Performance Measurement
article thumbnail

A Compendium of Works to Increase the Probability of Project Success

Herding Cats

Integrated Master Plan: The Foundation of Program Success , College of Performance Management, May 21, 2014. The Nine "I's" of Program Success ," College of Performance Management. Connecting the 5 Principles and 5 Practices of Performance-Based Project Management ® To Increase the Probability of Project Success.

2003 54
article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). But each method needs to be based on 5 Immutable principles to be successful, no matter the domain or context, PMI Spring Seminar , 2012, Austin TX. Risk Management (#RM).

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

When we hear about software development disasters and then hear that estimates are to blame, and NOT Estimating will somehow reduce or prevent these disasters, think again. Each of the categories operates in the presence of uncertainty and requires that estimates be made about the probability, conseqeunce of the resutling risk.

article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

All making things smaller dos is show that you're late, over budget, and what you're building (Technical Performance Measures) doesn't work faster. But when some statement is made about risk, estimating, performance modeling, or the like - always ask for references. This is good, but it doesn't reduce risk.

article thumbnail

Complete Collection of Project Management Statistics 2015

Wrike

Estimated Project-Oriented Job Openings 2010-2020: . Implement/enhance performance measurement process – 39%. [13]. Number of companies with a PMO has grown from 47% to 80% from 2000-2012. Inadequate cost estimates – 29%. Inaccurate task time estimate – 27%. March, 2014. 8,153,340. . 3,975,650. .

2015 60
article thumbnail

Modeling the Future is the Basis of Project Success

Herding Cats

For approaches that have been implemented on existing systems, obtaining such understanding may require measurement and analysis. For scenarios where the project under consideration does not yet exist, performance prediction using analytical modeling or simulation is necessary. 1-11, January 2014.