article thumbnail

Time is Money: The Importance of Earned Value Management

MPUG

In my previous article , I discussed the importance of a baseline, and how, without one, a PM doesn’t have a yardstick, per se, to measure with. Project Management presents many tools and techniques for the management of a successful project. To understand truly that ‘time is money,’ you need to use EVM in your projects.

article thumbnail

Building and Managing A Hybrid-Agile Plan with MS Project

MPUG

In fact, almost all possible Hybrid-Agile approaches can be managed within the MS Project software using its Agile features. The Agile, as well as all traditional features, are available in MS Project 2019 Online Desktop Client. We’ll build Sprint plans within the project and manage the integrated Hybrid-Agile aspects.

Agile 69
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Agile Project Management for Distributed Teams

nTask

Agile project management is an iterative approach to delivering requirements throughout the project life cycle. And since 2005, each year the remote workforce has increased by 10% which makes it 140% in 2019, which is huge.

article thumbnail

Overview of the PMBOK® Guide Seventh Edition – Lesson 1 Transcription

MPUG

Now, the standard for project management, on the other hand, it would have been typically process-focused. A step-by-step through those aspects that were described in the guide, the knowledge areas, and concentrating on the project life-cycle from beginning to end. Like, what are some innovations? Speaker 3:Excellent.

PMI 59
article thumbnail

Risk Management Resources

Herding Cats

Project Risk Identification Based on the Interaction of Risks from the Approach of Multi-Agent Simulation,” Peng Huang, Peng Di, and Jinrui Li, 4 th International Conference of Energy Equipment Science and Engineering , 2019. Planning, Tracking, and Reducing Complex Project’s Value at Risk,” Tyson R. 85 1 Feb 2019. “An

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

Project Risk Identification Based on the Interaction of Risks from the Approach of Multi-Agent Simulation,” Peng Huang, Peng Di, and Jinrui Li, 4 th International Conference of Energy Equipment Science and Engineering , 2019. Planning, Tracking, and Reducing Complex Project’s Value at Risk,” Tyson R. 85 1 Feb 2019. “An

article thumbnail

Project Requirements Management – Part 1: Introduction to Requirements Management Transcription

MPUG

Because look, 47% of unsuccessful projects fail to meet original goals due to poor requirements. In fact, in 2019 11.9% of every dollar was wasted due to poor project performance. Not only that, but 37% of completed projects experienced scope creep. But this really shows you the importance of requirements.