Remove Aerospace Remove Budget Remove Estimate Remove Influencer
article thumbnail

What are the Objectives of the Work Breakdown Structure (WBS)?

NimbleWork

A Brief History The Work Breakdown Structure (WBS) has its origins in the mid-20th century, evolving primarily in industries such as defense, aerospace, engineering, and construction. This decomposition continues until the work packages are small enough to be easily understood, estimated, assigned, and monitored.

article thumbnail

Risk Management Resources

Herding Cats

requires making estimates) ? Estimation of Long?Term Risk Analysis & Estimating Uncertainty … and what this has to do with the price of milk in McLean,” Phil Beenhouwer, The Society of Cost Estimating & Analysis (SCEA), May 17, 2006. Sensitivity analysis methods for uncertainty budgeting in system design,” Max M.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

requires making estimates) ? Estimation of Long?Term Risk Analysis & Estimating Uncertainty … and what this has to do with the price of milk in McLean,” Phil Beenhouwer, The Society of Cost Estimating & Analysis (SCEA), May 17, 2006. Sensitivity analysis methods for uncertainty budgeting in system design,” Max M.

article thumbnail

Software Estimating Resources

Herding Cats

This blog page is dedicated to the resources used to estimate software-intensive systems using traditional and agile development methods. COSMIC Software Estimation Approach,” Alain Abran, ICEAA Workshop, Portland Oregon, June 6?9, Estimating Probable System Cost,” Stephen A. Performance Evaluation of non?Markovian

article thumbnail

DDSTOP The Saga Continues

Herding Cats

In our domain of aerospace and defense, we have reference class for cost, schedule, architecture (DODAF), risk and other attributes of every system ever built in the DOD ( CAPE , CADE ) and NASA ( CARDe/Once ). maybe a read of the resources of Estimating Agile Software Development may help. For software development starts with.

article thumbnail

DDSTOP The Saga Continues

Herding Cats

40 - Estimation is a Problematic Practice of Companies Doing Dangerous Things. A #Noestimates advocate makes the claim that having a ±10% accuracy for estimates of cost and duration is a dangerous thing. Define the probabilistic ranges of the work in a single point estimate manner. There are databases for Function Points .