Risk Management Resources

Herding Cats

Risk Management is essential for development and production programs. Information about key project cost, (technical) performance, and schedule attributes is often uncertain or unknown until late in the program. Effective Risk Management 2 nd Edition , Edmund Conrow, AIAA, 2003. Risk Management Papers. “A De Meyer, C. “A

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

This blog page is dedicated to the resources used to manage the risk encountered on software-intensive systems using traditional and agile development methods. Let's start with a critical understanding of the purpose of managing risk on software development projects. IEEE Transactions on Software Engineering , Vol.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Without a Root Cause Analysis, No Corrective or Preventive Action is Credible - Part 1

Herding Cats

“A Taxonomy of an IT Project Failure: Root Causes,” Walid Al-Ahmad, Et Al, International Management Review, Vol. Why Do Information Technology Projects Fail?” Automated Root Cause Isolation of Performance Regressions during Software Development,” Christopher Heger, Jens Happer, and Roozbeh Farahbod, ICPE ’13, April 21?24,

2014 45
article thumbnail

DDSTOP The Saga Continues

Herding Cats

If you're not an expert, you're not going to recognize the possible solutions, risks, impediments, and opportunities for the problems you'll encounter in developing a solution that has never been developed before. For technical design, there are existing designs, patterns, packages, architecture references, and similar resources.

article thumbnail

DDSTOP The Saga Continues

Herding Cats

Define the risks - reducible and irreducible - to each Capability and their Features. For each risk define the probability of occurrence, the probability of impact, the probabilities of duration or cost impacts from that impact, the probability of success for the corrective or preventive actions, and the probability of any residual risk.

article thumbnail

Software Estimating Resources

Herding Cats

Bool, CrossLink: The Aerospace Corporation, Winter, 2000/2001, pp. Monte Carlo Schedule Risk Analysis,” Intaver Institute, Inc. Effort Estimation of Use Cases for Incremental Large-Scale Software Development,” Pareastoo Mohagheghi, Bente Anda, and Reidat Conradi, Proceedings of the 27th international conference on Software engineering.

article thumbnail

Estimating is a Learned Skill

Herding Cats

“Believing is Seeing: Confirmation Bias Studies in Software Engineering, “Magne Jørgensen and Efi Papatheocharous, 41st Euromicro Conference on Software Engineering and Advanced Applications (SEAA). Software quality measurement,” Magne Jørgensen, Advances in Engineering Software 30 (1999) 907–912.