What's Missing from the Agile Software Development Paradigm

Herding Cats

Agile software development is framed by a manifesto , a set of 12 principles, several methods. These are all focused on developing software, delivering that software to those paying the developers. Anything less results in systems not worth having or fail to function or perform. [3],

article thumbnail

A Compendium of Works to Increase the Probability of Project Success

Herding Cats

Project Performance Management. Connecting the 5 Principles and 5 Practices of Performance-Based Project Management ® To Increase the Probability of Project Success. Building a Credible Performance Measurement Baseline. Measures of Product Value is Exchange for Its Cost. Technical Performance Measures.

2003 54
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Product Development (#ProdDev). Agile Software Development (#ASD). Those lessons are directly transferable to the management of software development teams.

article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

All making things smaller dos is show that you're late, over budget, and what you're building (Technical Performance Measures) doesn't work faster. Oriented Perspective , 1st Edition, Terje Aven, John Wiley & Sons, 2003. Effective Risk Management , 2nd Edition, Edmund Conrow, AIAA, 2003.

article thumbnail

Start with Principles, Not Personal Anecdotes

Herding Cats

In the project domain, an estimate is a calculated approximation of some desired measurement. This is usually a cost, a completion date, a performance measure used in a closed loop control system to keep the project GREEN while delivering the needed Capabilities to produce the Value for the customer at the needed time for the needed cost.

article thumbnail

Modeling the Future is the Basis of Project Success

Herding Cats

For approaches that have been implemented on existing systems, obtaining such understanding may require measurement and analysis. For scenarios where the project under consideration does not yet exist, performance prediction using analytical modeling or simulation is necessary. The IMS is then placed on a baseline in the PMB.

article thumbnail

Complete Collection of Project Management Statistics 2015

Wrike

The number of firms with a PPM process in place grew from 64% in 2003 to 71% in 2013. [13]. Implement/enhance performance measurement process – 39%. [13]. Why a Majority of Business and IT Teams Anticipate Their Software Development Projects Will Fail. Portfolio Project Management (PPM). Healthcare – 76%.

2015 60