Cone of Uncertainty Bibliography

Herding Cats

The CoU paradigm defines the needed reduction in uncertainty is some performance metric. This can be the confidence in the estimate for any variable. It can be the needed performance of a measure - Effectiveness, Performance, Key Performance Parameter, or a Technical Performance Measures.

article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

All making things smaller dos is show that you're late, over budget, and what you're building (Technical Performance Measures) doesn't work faster. So here are some books, handbooks, and guides that sit on my shelf that are used pretty much all the time on the Software Intensive System of Systems we work on. No References?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

If we look at the discipline of software engineering, we see that the microeconomics branch of economics deals more with the types of decisions we need to make as software engineers or managers. Software engineering economics." IEEE Transactions of Software Engineering, 1 (1984): 4-21.

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). Estimates are needed but are subject to large level of uncertainty.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.