A Compendium of Works to Increase the Probability of Project Success

Herding Cats

Managment Processes. Project Governance. Integrated Master Plan: The Foundation of Program Success , College of Performance Management, May 21, 2014. The Nine "I's" of Program Success ," College of Performance Management. Forming, Storming, Norming, Performing, and Adjourning. Project Performance Management.

2003 54
article thumbnail

Compendium of Works to Increase Probability of Project Success

Herding Cats

Management Processes (#MP). Project Performance Management (#PPM). Technical Performance Measures (#TPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Cost, Schedule, and Technical Performance Management (#CSTPM). Governance (#Governance). Management Processes.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Fallacy of the Day

Herding Cats

Project Controls are Management Actions, either preplanned to achieve the desired result, or taken as a corrective measure prompted by the monitoring process. Project controls are concerned with the metrics of the project – quantities, time, cost, and other resources and their measurable beneficial outcomes for the project.

2005 37
article thumbnail

What's Missing from the Agile Software Development Paradigm

Herding Cats

The elements include all hardware, software, equipment, facilities, personnel, processes, and procedures needed for this purpose; that is, all things required to produce system-level results. The results include system-level qualities, properties, characteristics, functions, behavior, and performance. References . [1] 81-100, 2009. [4]

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

When actual measures of cost, schedule, and technical performance are outside the planned cone of uncertainty, corrective actions must be taken to move those uncertanties inside the cone of uncertanty, if the project is going to meet it's cost, schedule, and technical performance goals. . Resources. [1]

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

The Measures that are modeled in the Cone of Uncertainty are the Quantitative basis of a control process that establishes the goal for the performance measures. This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

When actual measures of cost, schedule, and technical performance are outside the planned cone of uncertainty, corrective actions must be taken to move those uncertanties inside the cone of uncertanty, if the project is going to meet it's cost, schedule, and technical performance goals. . Resources. [1] Air Force. [4]