Cone of Uncertainty - Revisited

Herding Cats

The Cone of Uncertainty,” Stephen Gryphon, Phillippe Kruchten, and Steve McConnell, Letters, IEEE Software , 23 (5) 2006, pp 8?10. Shrinking the Cone of Uncertainty with Continuous Assessment for Software Team Dynamics in Design and Development,” Pongtip Aroonvatanaporn,”Ph.D. 37–48, 2007. So here's the outcome.

2012 29
article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Microeconomics and Risk Management in Decision Making for Software Development

Herding Cats

If we look at the discipline of software engineering, we see that the microeconomics branch of economics deals more with the types of decisions we need to make as software engineers or managers. Software engineering economics." IEEE Transactions of Software Engineering, 1 (1984): 4-21.

article thumbnail

Risk Management is How Adults Manage Projects

Herding Cats

All making things smaller dos is show that you're late, over budget, and what you're building (Technical Performance Measures) doesn't work faster. Stewart, ACTEX Publications, 2006. Software Risk Management , Barry W. Loch, Arnoud DeMeyer, and Michael Pich, Wiley, 2006. This is good, but it doesn't reduce risk.