Sat.Feb 04, 2017 - Fri.Feb 10, 2017

Remove productivity
article thumbnail

3 Things That Stop You Making the Right Decision

Rebel’s Guide to PM

There may be weeks of high productions and outputs far surpassing the planned quantities. You have to remember those planned quantities represent average production. Follow more of Chris’s insights at his blog EntrePMeur. Like in any profession, there are highs and lows, ups and downs, ebbs and flows.

article thumbnail

Essential SAFe 4.0 – How is it Different from SAFe 4.0?

Digite

At the ‘Team’ level, the roles suggested for adoption are that of the Product Owner and the Scrum Master. Product Manager, SAFe. appeared first on Digité Blog. In other words, the RTE is responsible for the governance of an Agile Release Train, which is the basic unit around which the SAFe framework is organized.

Lean 83
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

7 Hacks for Effective Meetings

Celoxis

That’s our aim with this blog; 7 hacks to make meetings more effective. Sadly, 71% of employees feel that meetings are unproductive and executives feel that over 67% of meetings are failures (Source: The Muse). Doing away with meetings is not the solution. We just need to find ways to make meetings more effective.

article thumbnail

10 Most Inspiring Productivity Articles, 5/02/2017

TimeCamp

Make yourself comfortable and read these 10 Most Inspiring Productivity Articles from this week, chosen by our team! Our blog is a place where we provide all the productivity and time management knowledge. Another week comes with the most popular from our roundups.

2017 40
article thumbnail

Our Clients Loved It When We Started Using Active Collab

ActiveCollab

I remember discovering Active Collab on some blog and thinking it had what I needed. All in all, Active Collab improved our team communication, client collaboration, and drastically boosted our productivity. We are a premium agency and Basecamp didn’t look professional enough for our clients (while JIRA was too complicated).

Process 28