A Compendium of Works to Increase the Probability of Project Success

Herding Cats

Here are my collected works, presentations, briefings, journal papers, articles, white papers, and essays, used to increase the Probability of Project Success (PoPS) I've developed and applied over my career in the software-intensive system of systems domain. Project Performance Management. Technical Performance Measures.

2003 54
article thumbnail

Deconstructing The Cone of Uncertainty

Herding Cats

The paper on the Cone of Uncertainty is used by many in the No Estimates community as an example of why estimates are of little use. In this paper, there is data that does not follow the Cone of Uncertainty, in that the uncertainty of the estimates does not reduce as the project proceeds. Then there is some analysis.

2007 42
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). Estimates are needed but are subject to large level of uncertainty. There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). This is a closed loop control system for managing the program with a T echnical Performance Measure (TPM).