How to Recover A Troubled Program
Rebel’s Guide to PM
APRIL 2, 2023
Technical failure: this creates a program integration risk as what you are building might not sit in the organization’s architecture any longer. Control’ is the scope, dates and roles on the program which have been lost in through planning or execution in the first place. Bring in technical specialists as required.
Let's personalize your content