Remove Closing Remove Controlling Remove Software Engineering Remove Technical Review
article thumbnail

5 Agile Methodologies for Project Managers that are not Scrum Framework

Project Pulse Journal

Aimed at improving efficiency and minimizing waste by controlling inventory and production processes, "Kanban" — Japanese for "signboard" - utilized physical cards to signal the need for inventory replenishment or movement within the production line. Agile methodologies offer a path to mastering these challenges.

article thumbnail

In-Depth: The Evidence-Based Business Case For Agile

Scrum.org

Is it really that important that they are autonomous, able to release frequently, interact closely with stakeholders and spend all that time on continuous improvement? This requires highly controlled experiments where only the level of agility is manipulated in a team. So we went to Google Scholar and searched for review articles.

Agile 217
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Scrum Master Job (1): 4 Steps to Identify Suitable Employers or Clients

Scrum.org

The reasons for this are apparent, with software eating the world and the pace of innovation accelerating as the market-entry barriers of the technology sector are continuously lowered. Current tech trends — accelerated by the pandemic — threaten the very existence of many legacy organizations.

SCRUM 201
article thumbnail

How To Carry Out a Requirements Analysis

Wrike

Requirements analysis in software engineering . While requirements analysis is beneficial to any project, it is most common in software engineering. In software engineering, requirements analysis, known as requirement engineering, defines expectations for new software being built or modified. .

article thumbnail

Risk Management Resources

Herding Cats

Information about key project cost, (technical) performance, and schedule attributes is often uncertain or unknown until late in the program. Taxonomy-Based Risk Identification,” Marvin Carr, Suresh Konda, Ira Monarch, Carlo Ulrich, and Clay Walker, Technical Report, CMU/SEI-93-TR-6, Software Engineering Institute, June 1993.

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

Let's start with a critical understanding of the purpose of managing risk on software development projects. Information about key project cost, (technical) performance and schedule attributes is often uncertain or unknown until late in the program. IEEE Transactions on Software Engineering , Vol. De Meyer, C.

article thumbnail

Misunderstanding Making Decisions in the Presence of Uncertainty

Herding Cats

Accuracy - how close is the estimate to the actual value? So in the end, if we are to make a decision in the presence of uncertainty, we MUST make estimates to develop a reliable shipping date while producing an accurate and precise estimate of the cost, schedule, and technical performance of the product shipped on that date.

2003 46