Cone of Uncertainty Bibliography

Herding Cats

I work in a domain where the CoU is baked into the Integrated Program Performance Management (IPPM) processes flowed down from the buyer, in this case, the Federal Government. The CoU paradigm defines the needed reduction in uncertainty is some performance metric. IEEE Transactions on Engineering Management , 57 (4), pp.

article thumbnail

Misinterpretations of the Cone of Uncertainty

Herding Cats

The Cone of Uncertainty is a framing assumption used to model the needed reduction in some parameter of interest in domains ranging from software development to hurricane forecasting. The Cone of Uncertainty as a Technical Performance Measure. Closed Loop Stochastic Adaptive control in the presence of Evolving Uncertainty.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Cone of Uncertainty - Part Cinq

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Cinq (Updated)

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. This is the basis of Closed Loop Project Control Estimates of the needed reduction of uncertanty, estimates of the possisble reduction of uncertainty, and estimates of the effectiveness of these reduction efforts are the basis of the Close Loop Project Control System.

article thumbnail

Misquotes of Deming

Herding Cats

I spent the week speaking at the College of Performance Management conference where government and industry come together to work on the issues of cost, schedule, and technical performance management process improvement needed to increase the probability of program success. Technical Performance Measures.

article thumbnail

Cone of Uncertainty - Part Deux

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates or any other project attribute (in this post, cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.

article thumbnail

Cone of Uncertainty - Part Trois

Herding Cats

Barry Boehm's work in “Software Engineering Economics”. The Cone is a project management framework describing the uncertainty aspects of estimates (cost and schedule) and other project attributes (cost, schedule, and technical performance parameters). There can be cost and schedule performance measures as well.