Remove 2011 Remove Process Remove Software Engineering Remove Study
article thumbnail

In-Depth: The Evidence-Based Business Case For Agile

Scrum.org

We will share results from scientific studies that we located through Google Scholar. But adherence to a framework or prescribed process does not guarantee agility. Adherence to a framework or prescribed process does not guarantee agility.”. I prefer a process-based definition of agility. We worked with Prof.

Agile 206
article thumbnail

Risk Management Resources

Herding Cats

“Taxonomy-Based Risk Identification,” Marvin Carr, Suresh Konda, Ira Monarch, Carlo Ulrich, and Clay Walker, Technical Report, CMU/SEI-93-TR-6, Software Engineering Institute, June 1993. IEEE Transactions on Software Engineering , Vol. 5, September/October 2011. De Meyer, C. Loch, and M. 3, March 2002. 24, 2010. “A

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Compendium of Risk Management Resources

Herding Cats

“Taxonomy-Based Risk Identification,” Marvin Carr, Suresh Konda, Ira Monarch, Carlo Ulrich, and Clay Walker, Technical Report, CMU/SEI-93-TR-6, Software Engineering Institute, June 1993. IEEE Transactions on Software Engineering , Vol. 5, September/October 2011. De Meyer, C. Loch, and M. 3, March 2002. 24, 2010. “A

article thumbnail

Reading List for the Cone of Uncertainty

Herding Cats

The program management processes should seek to reduce uncertainty in the variable of the project. If there is no process in place to reduce these variables, the probability of project success is reduced. 10 Deadly Sins of Software Estimation , Steve McConnell , Construx, 2002. "A 1, January 2011. "A 1, January 2011. "A

2012 48
article thumbnail

Misunderstanding Making Decisions in the Presence of Uncertainty

Herding Cats

This quote demonstrates a lack of understanding of making decisions in the presence of uncertainty and the processes and events that create uncertainty. There is naturally occurring variability from uncontrolled processes. Aleatory uncertainty is expressed as a process variability. First, let's establish a principle.

2003 46
article thumbnail

Without a Root Cause Analysis, No Corrective or Preventive Action is Credible - Part 1

Herding Cats

Root Cause is the fundamental initiating cause on a causal chain leading to a failure of a process which results in a recurrence of the problem. Root Cause Analysis is a systematic documented approach to arrive at the true Root Cause of the process problem. A Case Study in Root Cause Defect Analysis,” Marek Leszak, Dewayne E.

2014 45
article thumbnail

Biases in Project Management and How to Remove Them

Herding Cats

Cognitive bias - a mistake in reasoning, evaluating, remembering, or other cognitive processes, often occurring as a result of holding onto one's preferences and beliefs regardless of contrary information. Because of that, we don't separate the thinking processes into a dual-system. A process based on tangible evidentiary materials.