Remove 2019 Remove Blog Remove Document Remove Monitoring
article thumbnail

5 Types Of Project Reports (Updated Nov. 2019)

ProjectManager.com

It’s probably easiest to do this as an automated download from your project management software , or if you keep your risk log in another format like a spreadsheet, by issuing a complete copy of that document. The template reports of our software will provide a needed head-start on monitoring your projects. Board/Executive Reports.

2019 394
article thumbnail

Top 9 Project Management Word Templates (Updated Nov. 2019)

ProjectManager.com

Instead of reinventing the wheel each time you start a new project, wouldn’t it be great to have a resource that collected a bunch of documents that have been already outlined to serve the purpose of managing a project? It’s all there on our Template Page , your one-stop shop for all your documentation needs. Yes, of course it would.

2019 250
Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

11 Must-Have Project Management Excel Templates (Updated Sept. 2019)

ProjectManager.com

Visit our Templates Page and you’ll find Excel and Word templates for creating all the project documents you need to manage your project. Now you have a plan in place to resolve that risk quickly, and a document that can be shared so risk is never given a chance to blindside a project. Thankfully, we’ve got you covered.

2019 209
article thumbnail

Sample Project Management Flow Chart

ProjectManager.com

But, a flow chart can also help with monitoring progress and even status reporting. There is naturally a flow chart to note the monitoring and control processes of the project, which starts with monitoring and control and leads to an integrated change control plan. Why Is a Visual Diagram to View Process Important?

article thumbnail

Cost-Plus Contract: How to Use One

ProjectManager.com

The most well-written contracts also outline things like how expenses should be documented by contractors and how any disagreements between contractor and employer should be handled. They require thorough documentation: Without the proper documentation of costs and expenses, it’s impossible for employers to reimburse contractors accurately.

article thumbnail

What Is a Project Management Communication Plan?

ProjectManager.com

You’re also going to need a review method in place to monitor the effectiveness of your communications. Now document what you’ve learned from this research and apply it to the present communication plan. Some like email, others prefer text or chat, and there are those who still like to get a printed document.

Planning 535
article thumbnail

AI Hype vs. Reality: Project Management Reimagined

The IIL Blog

” – Bank of America Merrill Lynch report (2019) There are also projections about specific types of jobs: “Human nurses will soon become obsolete with the rise of AI nurses that will provide better, cheaper, and more comprehensive healthcare.” Ensuring that AI systems are fair and equitable will take ongoing monitoring.